Distribution Case 01 · National Distributor Supplier

Expansion gate reset

Multi-DC rollout paused until landed margin and fee exposure were stabilized.

$382K Estimated Burn Avoided

The Problem

Multi-DC rollout was under pressure while contribution remained thin at current volume.

Root Cause Diagnosis

Freight, program fees, deductions exposure, and case-pick complexity were underestimated.

What PRO Evaluated

Landed contribution by lane, fee stack by customer class, order-profile volatility, fill-rate risk, rebate dependency.

The Intervention

Implemented a staged gate model, renegotiated key fee terms, and set lane-level contribution thresholds before each DC activation.

The Outcome

$382K projected downside avoided, preserving a cleaner path to profitable channel expansion.

The Lesson

Scale is only strategic when each added node clears contribution gates after real fee and service pressure.

Full Case Study Document

Download the complete diagnostic breakdown.

Includes the full root cause map, evaluation framework, and intervention sequence used in this engagement.

Download Case Study PDF →

If you're planning a DC expansion, model the real cost before you commit.

Validate your exposure with a Distribution Diagnostic →